What Is a Temporary Power Pole?
A temporary power pole, sometimes called a construction power pole or "spider box on a stick," is a freestanding pole with a meter socket and breaker panel mounted at a set height, built to code so the utility company can energize a site before a permanent electrical service is installed. It stands near the property line where the utility can run a service drop to it. Framingham Porta Pros sets these up for builders working across Framingham, whether that is a single-family renovation or a multi-unit job needing full construction site services. Most residential and light commercial jobs run on 100 amp service; larger sites with cranes, welders, or multiple trailers often need a 200 amp temporary power pole. If you are also renting a mobile office trailer or running a light tower, your amperage needs go up fast, and we size the pole to match your actual draw, not a guess.
How Does Temporary Power Pole Installation Work?
Installation starts with a site visit to confirm where the utility service drop will land and how far the pole sits from your panel, trailer, or temporary fence line. GFCI protection on construction circuits is required under OSHA 1926.404(b)(1)(ii), and our poles are wired to meet that standard before power gets turned on. We set the pole on a stable base, run the meter socket and breaker panel, and coordinate timing with your utility company for the actual hookup, since that final connection is theirs to make, not ours. Site housekeeping matters too. OSHA 1926.25 requires scrap and debris cleared from work areas, so we keep the pole zone clear during setup and again at pickup. If your project also needs a construction dumpster or a roll-off dumpster parked nearby, plan for about 60 feet of straight clearance behind the delivery truck, the same clearance a roll-off delivery needs.

What Does Temporary Power Pole Installation Cost in Framingham?
Cost depends on amperage, distance from the utility line, and how long the site needs power. A 100 amp pole costs less to set up and run than a 200 amp temporary power pole for construction site use, and short-term rentals cost less per day than a full month, though the per-day rate for a longer job is lower once you spread it out. We quote each Framingham job individually because utility hookup fees and distance vary by site, and we will not guess a number that is not accurate for your address.
| item | typical range |
|---|---|
| 100 amp pole, short-term | quoted per site |
| 200 amp pole, short-term | quoted per site |
| monthly rental, either size | quoted per site |
For sanitation costs on the same job, see porta potty rental cost or monthly porta potty rental pricing, since most Framingham crews order both together. We serve job sites across Framingham and nearby towns including Ashland, about 4.9 miles southwest, and Natick, about 5.9 miles east.
How long does temporary power pole installation take?
Most Framingham installs take one visit once the utility company confirms the service drop location. Delivery, pole setup, and panel wiring usually finish the same day. The actual energization depends on the utility's schedule, not ours, so book early if your construction site services start date is fixed.
Do I need a permit for a temporary power pole in Framingham?
Placement and permitting requirements vary by property and utility territory, and that needs confirming with the City of Framingham directly. We do not guess on permit rules. Check with the city before your delivery date, and see our dumpster permit requirements page for how we handle similar questions on other equipment.
What size temporary power pole does my site need?
It depends on your equipment load. A single trailer or shed often runs fine on 100 amp service, while sites running welders, multiple light towers, or several trailers usually need a 200 amp temporary power pole. Tell us your equipment list and we size it correctly.
Can I rent a power pole with other site equipment?
Yes. Most Framingham crews order the pole alongside a temporary fence, a roll-off dumpster, and portable restrooms sized using our how many porta potties do I need guide. Bundling delivery saves a trip and keeps your site organized from day one.
Does the power pole include the utility hookup?
No. We install and wire the pole to code, but the utility company makes the final service connection. Coordinate your account setup with them early, since utility scheduling is often the longest lead time in the whole construction site services process.